Our works involved the following: breaking out of the existing concrete surface, removal of concrete waste from site, and excavation of trenches to the required depth. Steelwork supplied and fitted by Kenex engineering, D49 wrapping mesh to steelwork, 20mm thick compressible isolation joint to trench edge before filling with RC50XF Concrete.