Class Q Agricultural Conversion

Class Q permitted development groundworks for agricultural building conversion to residential use in Liskeard, Cornwall

📍 Liskeard, Cornwall
🏗️ Conversion Project
Completed 2024

Project Overview

D Hall Plant Hire & Groundworks undertook a Class Q permitted development conversion of a disused agricultural barn (approximately 185 square meters) into 3 residential properties in Liskeard, Cornwall. Class Q is a form of permitted development allowing for the conversion of agricultural buildings to residential use for up to a maximum of 5 dwellings. The client had pre-completed internal fittings removal and floor lowering work before our involvement.

The structural work included concrete wall removal from east and west gables, concrete stanchion cutting and retention, perimeter foundation breaking and removal, and foundation digging for internal walls. We installed comprehensive drainage infrastructure for all three properties with inspection chambers, including a 12-person sewage treatment plant at depths exceeding 4 meters with concrete encasing and ring installation. All ducting for electricity, water, and sewage systems was installed along with three radon sumps and associated pipework.

The floor works comprised a 50mm concrete blinding layer, radon membrane installation using RIW blackjack and Visqueen tanking membranes, A252 reinforcing mesh with L-bars, and 150mm of C40 concrete for the new floor slab. We completed perimeter upstand shuttering and concrete casting, and excavated and trimmed one barn side to improve site access for subsequent trades. The project was completed using a 13-ton excavator and 9-ton dumper with full CDM compliant welfare facilities.

Key Work Completed

Concrete wall removal from east and west gables

Concrete stanchion cutting, squaring, and retention

Perimeter concrete foundation breaking and removal

Foundation digging for internal walls at varying widths

Drainage infrastructure for all 3 properties with inspection chambers

Installation of 12-person sewage treatment plant at 4m+ depth

Concrete encasing and ring installation for deep treatment plant

Ducting for electricity, water, and sewage systems

Three radon sumps with associated pipework

50mm concrete blinding layer

Radon membrane installation (RIW blackjack and Visqueen tanking)

A252 reinforcing mesh with L-bars

150mm C40 concrete floor slab

Perimeter upstand shuttering and concrete casting

Excavated and trimmed one barn side for trade access

Equipment Used

13-ton excavator

9-ton dumper truck

RIW blackjack tanking membrane

Visqueen tanking membrane

CDM compliant site welfare unit

Project Gallery

Disused agricultural barn before Class Q conversion Liskeard

Original Barn Structure

Concrete wall removal and stanchion cutting Class Q conversion

Structural Alterations

Foundation excavation for internal walls barn conversion

Foundation Excavation

Drainage infrastructure installation for 3 residential properties

Drainage System

12-person sewage treatment plant installation at 4m+ depth

Sewage Treatment Plant

Radon sump installation with pipework barn conversion

Radon Protection

Concrete blinding layer and radon membrane installation

Membrane Installation

A252 reinforcing mesh with L-bars preparation

Reinforcement Setup

C40 concrete floor slab pouring 150mm depth

Concrete Slab Pour

Perimeter upstand shuttering and concrete casting

Perimeter Upstand

Progress view of barn conversion groundworks Liskeard

Construction Progress

Completed groundworks for residential barn conversion

Groundworks Complete

Finished Class Q conversion ready for building phase

Ready for Construction