Coastal Groundworks

Specialized groundworks in coastal location with challenging access and terrain conditions in Looe, Cornwall

📍 Looe, Cornwall
🏗️ Coastal Project
Completed 2024

Project Overview

D Hall Plant Hire & Groundworks completed an eco-house groundworks project in woodland near Looe, Cornwall, designed by architect Robert Rowett. This challenging project was completed in two distinct phases due to very limited site access through tight Cornish lanes.

Phase 1 focused on establishing site access, with materials transported approximately 900 meters via 3-tonne dumper as grab lorries couldn't navigate the tight lanes. Work included reduced dig excavation, soakaway system, trenching for 32mm water pipe, kerbs/edgers, and Type 1 stone with tarmac surfacing to enable vehicle access for subsequent phases.

Phase 2 involved extensive piling infrastructure with construction of a piling mat to support the rig, drilling of 41 Odex piles to varying depths, and pumping of over 100 meters of concrete for pile caps. Despite very challenging conditions and limited access, the site offered plenty of room once equipment arrived, creating the complete foundation system upon which the eco-house structure would be built.

Key Work Completed

Phase 1: Site access road with 900m material transport via 3-tonne dumper

Reduced dig excavation for eco-house foundation

Soakaway system installation

Trenching for 32mm water pipe

Kerbs and edgers installation

Type 1 stone sub-base and tarmac surfacing for vehicle access

Phase 2: Piling mat construction to support piling rig

41 Odex piles drilled to varying depths

Over 100 meters of concrete pumped for pile caps

Complete foundation system for eco-house structure

Equipment Used

3-tonne dumpers for 900m material transport

Excavators for site preparation

Odex piling rig

Concrete pump for pile caps

Tarmac surfacing equipment

Project Gallery

Eco-house site preparation in woodland near Looe Cornwall

Initial Site Setup

Site access road construction through tight Cornish lanes

Access Road Construction

Reduced dig excavation and soakaway system installation

Excavation & Drainage

3-tonne dumper transporting materials 900 meters to site

Material Transport

Type 1 stone and tarmac surfacing for vehicle access

Tarmac Surfacing

Piling mat construction for Odex piling rig operations

Piling Mat Construction

Odex pile drilling at eco-house woodland site

Pile Drilling

Concrete pumping for pile caps over 100 meters

Concrete Pour

41 Odex piles completed for eco-house foundation

Piling System Complete

Completed groundworks and piling foundation system Looe

Finished Foundation