Gas Bottle Storage Compound
Commercial groundworks and compound construction for gas bottle storage facility in Plymouth, Devon
Project Overview
D Hall Plant Hire & Groundworks completed a comprehensive gas bottle storage facility for a repeat commercial customer in Plymouth, Devon. This project showcased our ability to manage the complete project lifecycle, from demolition through final landscaping and security installations.
The scope of work included breaking out and removing over 40 tonnes of existing concrete, disposing of waste at a licensed recycling facility, installing a new 150mm type 1 sub-base with Visqueen membrane and A252 reinforcing mesh, pouring 150mm of C35 concrete with a brushed finish, and completing the installation with V-mesh security fencing and 20mm gravel finishing layer to meet commercial safety standards.
Key Work Completed
Broke out and removed over 40 tonnes of existing concrete using Prodem Hydraulic Hammer
Disposed of concrete waste at licensed recycling facility
Imported and compacted 150mm of type 1 sub-base material in layers
Installed Visqueen membrane barrier
Placed A252 reinforcing mesh on plastic chairs
Poured 150mm of C35 concrete with brushed finish
Installed V-mesh security fencing
Applied 20mm gravel finishing layer
Equipment Used
Case CX80C 8-tonne excavator
3-tonne Thwaites Dumper
Prodem Hydraulic Hammer
Bomag 120 Roller
Project Gallery

Site Preparation Phase

Concrete Removal

Sub-base Installation

Reinforcement Setup

Concrete Installation

Security Fencing

Completed Installation