New gas bottle storage area for a repeat commercial customer.
After successfully tendering for this project in Plymouth, Devon we mobilised our Case CX80C 8T excavator & 3T Thwaites Dumper we broke out over 40T of concrete with our Prodem Hydraulic Hammer and loaded away the concrete to a licenced tip for recycling. We then imported .150mm of type 1 sub-base and compacted in layers with our Bomag 120 Roller, formed shuttering, Visqueen membrane, A252 reinforcing mesh on plastic chairs followed by .150mm of C35 concrete with a brushed finish. V mesh security fencing was installed by D.Hall Plant Hire & Groundworks and to finish it off we imported some 20mm gravel to finish it off.
Before

Before

Before
Concrete Removal with Hydraulic Breaker

Concrete Removal / Breaker

Concrete Removal
New 150mm C35 Concrete Base

150mm Concrete
After - Completed with V Mesh Security Fencing

After with V Mesh Fencing

After with V Mesh Fencing
Contact us below to discuss your project
Get in Touch